Interfaces
HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
 QUICK SEARCH:   [advanced]


     


INTERFACES
Vol. 37, No. 2, March-April 2007, pp. 187-196
DOI: 10.1287/inte.1060.0259
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow reprints & permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Farmer, A.
Right arrow Articles by Miller, L. T.
Right arrow Search for Related Content

Scheduling Umpire Crews for Professional Tennis Tournaments

Adam Farmer, Jeffrey S. Smith, Luke T. Miller

Culverhouse College of Business, University of Alabama, Box 870226, Tuscaloosa, Alabama 35487-0226
College of Engineering, Auburn University, 207 Dunstan Hall, Auburn, Alabama 36849
School of Business Administration, Fort Lewis College, 1000 Rim Drive, Durango, Colorado 81301

afarmer{at}cba.ua.edu
jsmith{at}auburn.edu
miller_l{at}fortlewis.edu

Professional tennis organizations, such as the United States Tennis Association (USTA), the Association of Tennis Professionals (ATP), the International Tennis Federation (ITF), and the Women’s Tennis Association (WTA), host tennis tournaments throughout the world. At these tournaments, chief umpires assign and schedule line umpires for every match. For most tournaments, they perform this task manually, which can be cumbersome for large tournaments. For large tournaments, such as the US Open, they can use software developed to facilitate scheduling. Unfortunately, the software package currently available often creates suboptimal or infeasible schedules that must be manually adjusted. We developed a program based on optimization that automates the scheduling procedure. Our program consistently provides high-quality schedules in as little as 25 percent of the time taken with other methods.

Key Words: recreation and sports; programming; integer






HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
Copyright © 2007 by INFORMS.